AETEC
AETEC · Application engineering

Controller assembly with ABB SCARA robots

Initial concept · Rev B
3 November 2026
Assembly studio
Rendered stage view
Assembly sequence

    Silent interactive model · Drag the 3D view to orbit. The follow camera switches to an overhead inspection view at both checks. Animation time is illustrative.